A CLOSER LOOK AT FIBER DRAW TOWER TECHNOLOGY

Intermittent Bonded Ribbon Production Line Available For Sale

A specified speed of 600 m/min gives this equipment considerable production capacity for optical-fiber applications. Before making purchasing plans, buyers should verify the actual speed, configuration, and operating conditions with the manufacturer.

Shanghai Weiye OFC provides a system engineered to manufacture 12- and 16-fiber rollable ribbons. The published product information covers capabilities, technical details, and supplied systems, helping U.S. buyers begin evaluating the equipment against their manufacturing needs.

Begin by examining the stated equipment configuration, then ask the supplier for pricing, installation requirements, and project-specific alternatives. This approach helps determine which equipment details apply to your particular manufacturing site and goals.

Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. provides its business address as 201 Minyi Road, Songjiang District, Shanghai. Consider the product listing a preliminary information source, and confirm up-to-date specifications and commercial terms with the supplier. A detailed quotation request can help advance your equipment evaluation.




Important Points To Consider

  • The stated operating speed is 600 m/min, although the manufacturer should confirm the applicable conditions.
  • This equipment supports production of 12-fiber and 16-fiber rollable ribbon formats.
  • Information about equipment functions, specifications, and included systems appears on the product page.
  • Request details about pricing, installation requirements, and project-specific customization.
  • A company address in Shanghai’s Songjiang District is included in the supplier information.

Overview Of The Intermittent Bonded Ribbon Production Line

According to the supplier, the equipment is designed for rollable IBR configurations containing 12 or 16 fibers. The published specifications state a 600 m/min construction speed together with a fiber diameter of Ф245 μm ±10 μm. As these are manufacturer-listed values, confirm the actual production speed and relevant operating requirements directly with the supplier.

Intermittent Bonded Ribbon Production LineIntermittent Bonded Ribbon Production Line

Equipment Designed For Twelve- And Sixteen-Fiber Rollable Ribbon Production

The machine configuration accommodates two different fiber counts in rollable ribbon designs. This provides a useful reference when buyers compare machinery against their required ribbon format, fiber dimensions, and material-handling arrangements.

How Intermittent Adhesive Bonding Allows Flexible Fiber Configurations

According to examples in the patent, fibers are arranged in adjacent subunits with adhesive connections applied periodically. The patent provides an example of adhesive-bond intervals ranging between 10 mm and 1,000 mm. This differs from a continuously bonded structure in which the connection extends across the full ribbon length.

These intermittent adhesive connections allow the assembly to change from a relatively flat configuration into rolled, curled, or folded forms. The specified spacing illustrates the patented design concept rather than confirmed production-machine settings.

  • Machine details: A choice of 12 or 16 fibers, a listed operating speed of 600 m/min, and a specified diameter of Ф245 μm ±10 μm.
  • Patent example: Adhesive-bond intervals ranging from 10 mm to 1,000 mm.
  • Design benefit: Adaptable handling when the ribbon takes different shapes.

Applications In Optical Fiber Cable Manufacturing

Flexible ribbon arrangements can help cable designers balance access for splicing with compact cable packaging. The patented design keeps fibers arranged in order while permitting sections between bonded points to shift as the cable is assembled.

Compact Cable Designs And High Fiber Density

For mass fusion splicing, an optical fiber ribbon can be arranged flat before being folded or rolled into a more compact cable. Potential advantages described in the patent include smaller cable constructions and an increased ratio of fiber area to overall cable cross-sectional area. Actual performance and dimensions will vary according to the overall cable design and the application for which it is intended.

Organizing Fiber Ribbons To Support Efficient Fusion Splicing

This design supports orderly fiber handling during splicing while providing flexibility for subunit movement in the assembly process. For production material planning, the listed specifications include payoff reels accommodating 25.2 km and 50.4 km of fiber. Buyers can evaluate these capacities against their production requirements and existing handling arrangements.

Design detail Potential use Buyer consideration
Planar fiber arrangement Mass fusion splicing Verify the needs of your splicing process
Ribbon configuration that folds or rolls Space-efficient cable packaging Examine the complete cable design
25.2 km and 50.4 km capacity payoff reels Planning material-handling operations Align reel capacities with operating needs

Production Line Specifications And Performance

Before asking for pricing, assess whether the stated machine performance matches the demands of your production process. Installation preparations should also account for suitable reels and the utilities available at the production site.

Production Speed, Fiber Diameter, And Attenuation

According to the specifications, the construction speed reaches 600 m/min. The listed fiber diameter is Ф245 μm ±10 μm, with additional attenuation of ≤0.01 dB/km measured at 1550 nm. Confirm the measurement conditions and expected performance directly with the manufacturer.

Compatibility With Payoff And Take-Up Reels

Two payoff reel sizes are offered, with each full reel limited to 10 kg. The take-up assembly supports a T-type reel as well as a fiber-optic reel. Verify that your selected reel configuration is compatible with the facility’s material-handling process.

Site Utilities And Environment

The machine requires a three-phase, five-wire electrical supply rated at 380 V ±10%. The equipment should operate in an enclosed, clean, dry, draft-free area maintained at 15 to 25°C and a maximum relative humidity of 85%. Nitrogen must be supplied at 7 bar with 99.99% purity, together with compressed air at 6 bar. Verify the required utility connections before installation begins.

Specification Listed requirement Planning note
Reels for fiber payoff Payoff dimensions of Ф236 × Ф25.4 × 108 mm or Ф267 × Ф25.4 × 180 mm; full reel ≤10 kg Check reel compatibility and maximum weight
Reel used for take-up T-type dimensions of Φ410 × Φ50.8 × 391 mm, or a fiber-optic reel Verify the preferred reel format
Power and environment 380 V ±10%; 15 to 25°C; relative humidity ≤85% Prepare a dry, clean, draft-free operating area
Gas supply Nitrogen at 7 bar and 99.99% purity; compressed air at 6 bar Check available gas capacity before equipment setup

Fiber Payoff And Gathering Equipment

Optical fibers are guided toward the forming section by the payoff and gathering components. The associated controls help maintain a steady supply of fiber while reducing handling risks.

Sixteen-Spool Payoff With Tension Control

The payoff assembly holds 16 spools and provides traversing along with separately adjustable tension settings. The permitted weight for an individual spool is up to 10 kg. Detailed specifications indicate a tension range of 0.4 to 2 N, accuracy of ±0.02 N, and a 550 W motor. Another overview gives a range of 40 to 150 g and accuracy of ±2 g, so buyers should confirm which specification applies to their configuration.

Fiber Guiding, Break Detection, And Electrostatic Control

U-groove guides, multi-groove gathering rollers, and anti-jump components channel fibers into the forming section. Operators receive alerts about fiber problems through break detection and alarm functions. Safe handling is supported by protective guards and a pneumatic clamping mechanism. A rod-type electrostatic dust collector is positioned at the fiber exit, and additional anti-static devices help control dust throughout the gathering path.

Component Specified details Purpose
Payoff 16 spools with a maximum of 10 kg each Supplies fibers using traversing
Tension and motor Tension of 0.4 to 2 N, accuracy ±0.02 N; motor rated 550 W Supports regulated payoff of fibers
Fiber guidance and safety features Rollers with grooves, warning alarms, protective guards, and a pneumatic clamp Directs fibers and supports safe handling
Static control Rod-type dust collector and anti-static equipment Helps reduce dust near fiber routes

Precision Molding And Intermittent Adhesive Dispensing

The ribbon-forming platform allows operators to control the mold position and placement of adhesive. Available adjustments help configure the process for each required ribbon format.

Adjustable IBR Mold Platform For Ribbon Formation

Ribbon formation uses three mold assemblies, each capable of holding up to five Nordson EFD jet valves. Operators can position the mold within 0 to 15 mm and adjust its base temperature from 20°C to 60°C. Precision valve groups mounted on sliding tables allow fine positioning and accurate application of adhesive dots.

Configurable Nozzle Arrangements For Twelve- And Sixteen-Fiber Ribbons

The 12-fiber configuration employs a 5+5+1 valve arrangement. Production of the 16-fiber format uses a 5+5+5 configuration. Operators can adjust adhesive-dot spacing and the number of dots through the interface to match the selected optical fiber ribbon design. The process calls for a specialized adhesive suitable for both coating and curing.

Setting 12-Fiber Format 16-Fiber Format
Dispensing valve layout Valve arrangement of 5+5+1 5+5+5 valve configuration
Mold positioning range Adjustment range of 0 to 15 mm 0 to 15 mm adjustment
Mold-base temperature Temperature range of 20°C to 60°C 20°C to 60°C operating range

UV-LED Curing For Bonded Fiber Ribbons

Adhesive across the fiber assembly is cured through a sequence of UV exposure stages. The arrangement of the ovens and their published operating values provide buyers with information for evaluating process compatibility.

Initial Pre-Curing And Main Curing Operations

Pre-curing is handled by three specialized 800 W LED-UV ovens. Each oven processes fibers supplied by a separate mold group before the material reaches the main 6 kW post-curing oven. The system uses adjustable shutters to help contain UV exposure and minimize nitrogen losses. Published specifications identify a dominant wavelength of 395 nm ±3 nm, a curing degree of at least 85%, and post-curing power of at least 2.5 kW.

Nitrogen Management And Curing Performance

The nitrogen flow rate and pressure can be adjusted by hand. Automatic functions also start nitrogen delivery during startup and stop it at shutdown. At production speed under continuous stable conditions, the specified lamp-array power consumption is no more than 80% of total power. The figures are useful for initial equipment assessment, but buyers should confirm the conditions under which they were measured. Discuss how the operating settings may change depending on the adhesive and materials selected.

Visual Monitoring, Capstan, And Take-Up

Visual inspection and consistent winding help preserve fiber quality as material passes through the production line. Buyers can use the listed specifications to assess whether the machine meets the demands of their cable manufacturing process.

Real-Time Inspection Of Fiber Colors And Adhesive Dot Placement

Real-time magnified views are displayed through the machine’s microscope and camera system. Operators can inspect optical-fiber color order and verify the presence of resin dots at individual dispensing locations. This inspection helps identify ribbon problems before the material enters the winding stage.

Precision Take-Up With Servo-Controlled Traction

A 1 kW AC servo motor powers the capstan’s Φ190 mm traction wheel. The listed measurement accuracy exceeds 1‰. Operators can set tension between 50 and 500 g while maintaining an accuracy of ±5 g. Together, these settings support controlled movement and handling of the fiber ribbon.

Take-up operation is rated at 600 m/min with a spool weight limit of 30 kg. Servo-controlled winding and traversing systems help maintain consistent material placement. Cable pitch can be adjusted continuously between 1 and 6 mm. A photoelectric sensor monitors position and assists with reversing direction. Confirm that the operating conditions and settings are suitable for your target cable design with the supplier.

Production Monitoring And Electrical Control Systems

Clear control functions help production staff manage settings, monitor system conditions, and prepare smooth stopping procedures. The supplier identifies Siemens control equipment and Schneider Electric switchgear as components of the production line.

PLC And Touchscreen Operation

Siemens S7-1200 and S7-1500 PLCs manage the ribbon manufacturing system through a 10.4-inch Siemens touchscreen. Schneider Electric provides the low-voltage switching equipment. The system supports both interlocked operation across the full production line and separate operation of individual units.

Process Settings, Warning Alarms, And Preset-Length Shutdowns

Through the touchscreen, operators can manage process settings, activate curing ovens, configure wire feeding, and view alarms. Additional displays provide lamp runtime, real-time current readings, curing-oven temperature, and total machine operating hours. The meter-counter calibration feature allows displayed counts to be aligned with the distance actually traveled.

Operators can program a target production length that triggers deceleration or shutdown. This provides a practical way to control the end of a cable production run. Ask the manufacturer to confirm control capabilities and setup requirements before placing an order.

Control feature Published specification Use
PLC and display Siemens S7-1200 and S7-1500 PLCs with a 10.4-inch touchscreen Adjust and review operating information
Electrical components Schneider Electric low-voltage switchgear Supports electrical control operations
Monitoring and stopping Operating data for lamps, ovens, runtime, and meters; preset-length function Monitor production and stop or decelerate the equipment

Materials, Process Compatibility, And Ribbon Quality

The selected adhesive influences coating uniformity and the quality of the finished ribbon. Rather than recommending a general adhesive, the supplier specifies a formulation dedicated to the equipment’s coating and curing operations.

Dedicated Adhesive For Bonding And Curing

Separate valve switches on the pressurized adhesive supply let operators control individual feed paths. Adhesive flow to each dispensing point is managed using precision pressure-control valves. Air pressure can be regulated but must remain at or above the listed minimum of 0.5 MPa.

The adhesive lines are black to reduce the risk of UV-triggered reactions while the system operates and cures material. This protection is important because premature exposure may change adhesive properties before application to the fiber.

Before selecting materials for a secondary coating line, verify adhesive compatibility, production settings, and required surface-quality standards with the supplier. Ask how the recommended adhesive performs under your intended application conditions and expected production length. Detailed manufacturing guidance can support consistent quality throughout setup and the completed run.

Installation Requirements And Included Documentation

Ensure the workspace and utility supplies are ready before scheduling the machine’s installation. The manufacturer’s stated requirements help buyers prepare their facilities and maintain stable operation of the optical fiber equipment.

Required Facility Conditions And Connections Provided By The Buyer

Install the machinery in a clean, dry, enclosed environment protected from drafts. Keep the operating area between 15 and 25°C, with humidity at or below 85%. The installation also requires nitrogen supplied at 7 bar with 99.99% purity and an air supply rated at 6 bar.

The equipment package does not include connecting cables or cable trays. The buyer must arrange the principal power feed-in cable. Verify the available utilities and planned cable routes ahead of setup, especially if a secondary coating section is nearby.

Documentation For Operation, Installation, And Maintenance

The supplier includes documentation supporting machine installation, operation, and servicing. Review these records before startup to help staff plan work activities and identify necessary supplies.

  • Instruction manuals, operating guides, and a general layout drawing
  • Electrical schematics, wiring diagrams, and drawings for installation and maintenance
  • Purchased-component instructions and a wear-parts list to support service preparation

These documents help maintenance and production teams prepare for initial startup and regular equipment care.

Selecting A Ribbon Production Line That Matches Your Manufacturing Requirements

First determine which finished ribbon products your business plans to offer. The machinery supports 12F and 16F formats and has a stated construction speed of 600 m/min. Assess the stated capabilities against your planned range of products, throughput requirements, and projected cable orders.

Verify take-up reel compatibility before placing an equipment order. The standard IBR reel has dimensions of Φ410 × Φ50.8 × 390 × Φ310 mm, supports up to 30 kg, and provides cable pitch adjustment from 1 to 6 mm. Check that these specifications suit your production facility and material-handling operations.

The compatibility of payoff spools should be reviewed as well. The listed choices include internationally standardized spools with capacities of 25.2 km, 50.4 km, and 63 km. Obtain the exact spool dimensions before ordering materials or planning the length of manufacturing runs.

Evaluate utilities, adhesive requirements, and operator-monitoring capabilities alongside production speed. Assess whether the equipment arrangement is appropriate for fiber cable, loose tube, or the specific application in your cable production process. Before ordering, review equipment configuration and startup requirements directly with Shanghai Weiye. A thorough compatibility assessment can help prevent expensive modifications later.

Planning point Listed detail Buyer check
Ribbon configurations and operating speed 12F and 16F formats; 600 m/min Compare with target production and product mix
Take-up configuration Maximum 30 kg; cable pitch of 1 to 6 mm Verify that the reel and site arrangements are suitable
Payoff spools 25.2 km, 50.4 km, and 63 km spool capacities Verify exact spool dimensions

How To Request A Quotation For The Intermittent Bonded Ribbon Production Line

U.S. buyers can evaluate a system offering 12F and 16F formats, a specified construction rate of 600 m/min, and specialized optical fiber ribbon-forming equipment. Use these specifications to determine whether the machine is appropriate for your intended cable application.

When requesting a quotation, provide the required ribbon format, expected output volume, preferred reels, and available site utilities. Also describe the fiber type and handling requirements so Shanghai Weiye can evaluate the proposed configuration.

Before ordering, verify adhesive compatibility, the specified LED wavelength of 395 nm ±3 nm, and the published curing performance. Ask the supplier how these parameters relate to the chosen materials and required surface quality.

Consult the product page for the published equipment description. Verify the final configuration, shipment details, and installation commissioning with Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. The company’s listed address is 201 Minyi Road, Songjiang District, Shanghai. Telephone 021-60701630 to discuss your manufacturing requirements. Providing complete information in your quote request makes the following stages easier to clarify.